> For the complete documentation index, see [llms.txt](https://docs.enlyze.com/llms.txt). Markdown versions of documentation pages are available by appending `.md` to page URLs; this page is available as [Markdown](https://docs.enlyze.com/en/resources/production-context/production-runs/sync-production-runs-automatically.md). Agents can also search and read this documentation through its [MCP server](https://docs.enlyze.com/~gitbook/mcp).

# Sync production runs automatically

Take over production runs automatically and continuously from your ERP or MES system.

If your runs are already maintained in a system of record such as an ERP, MES or BDE system, an automatic sync is the most reliable way. ENLYZE then takes over the runs continuously, including planned runs, without anyone entering them twice.

An ENLYZE integration expert sets this up. Depending on your system, there are two options:

* [Integration of MES, BDE, or ERP-Systems](https://docs.enlyze.com/en/connect/it-connectivity/integration-erp-mes.md): through an API or direct database access.
* [Synchronising production context via machine data](https://docs.enlyze.com/en/connect/it-connectivity/synchronising-machine-data.md): when run and product information is available directly in the PLC.

The external system stays the source of truth. You can view the runs of synced machines in ENLYZE, but you can't edit them or add to them by import. The app marks these machines as **Synced externally**.
