ENLYZE
🇬🇧 ENLYZE
🇬🇧 ENLYZE
  • Welcome to ENLYZE
  • Getting Started
    • Quickstart
  • Guides
    • Platform Configuration
    • Machine Setup
      • Variable Selection
      • Configuring OEE Data Collection
      • Machine Data Sheet Template
    • Defining Downtime Reasons
    • Downtime Contextualisation
    • Connecting Booking Data
      • Integration of MES, BDE, or ERP-Systems
      • Synchronising Production Context via Machine Data
      • Booking Production Orders via the ENLYZE App
    • SPARK Setup
      • Preparations
      • Installation
      • Connecting to the Manufacturing Data Platform
    • ENLYZE EDGE
      • Accessing the Interface
      • Configuring the Network
      • Setting Up Routes
      • Managing Routes
      • Network Tools
      • Troubleshooting
  • PLATFORM
    • Integrations
      • Grafana
        • Structure of the ENLYZE Data Sources for Grafana
        • Connecting ENLYZE to Grafana
        • Tutorials
          • First steps with Platform Grafana
          • Grafana Basics for Process Monitoring
          • OEE data with Infinity data source
          • Mapping UUIDs to Display Names with Infinity Data Source
      • Power BI
        • Installing the ENLYZE Power BI Integration
        • Structure of the ENLYZE Power BI Connector
        • Tutorials
          • Getting Started with the ENLYZE Power BI Connector
          • Querying Time Series Data from Machine Variables
          • Querying Machine Productivity Metrics
          • Mapping UUIDs to Display Names
          • Calculating Aggregated Timeseries Data
  • EDGE
    • Overview EDGE Functionalities
    • SPARK Edge Device
    • ENLYZE EDGE
  • IT Security
    • IT Security
  • Why is the connection secure even though a warning is displayed
  • How to Choose the Right Integration Scenario?
  • Resources
    • Glossary
Powered by GitBook
On this page
  1. Guides
  2. Connecting Booking Data

Synchronising Production Context via Machine Data

For some machines, information about the current production order and product is directly available on the PLC or another OT data source. In such cases, we can retrieve this information by connecting to the respective data source.

To do this, we specifically access the variables in the control system that describe the production order and the product. We then link this data with the recorded time series data and translate it into a structured production order assignment.

The setup of this function is carried out by one of our integration experts and is based on the required effort. For more information and a cost estimate, simply contact your ENLYZE representative.

PreviousIntegration of MES, BDE, or ERP-SystemsNextBooking Production Orders via the ENLYZE App

Last updated 3 days ago